WML Offices
Project descriptionOver the past 20 years WML Consulting Engineers has vastly grown to become a leader amongst Namibia’s engineering industry. As such the staff content tripled and the growing need for a more spacious and modern office facilities became a reality. Planning for a likely future expansion already started back in 1996 and the end of 2016 marked the ground breaking ceremony.
The new offices buildings, Block A and B, consists of 3 and 2 storeys respectively. The backbone of the building is a concrete frame with masonry infill and the main building is topped off by a large overhanging, steel roof. The design was shape around the main structural elements of our building industry – concrete, steel and timber. A giant wall joins the two office blocks and rises high beyond the building eaves. This concrete wall forms a prominent feature which, besides offering shear stability, symbolises our strongly founded stand within the industry. Plenty of natural light allows for a greener footprint and rain water harvesting allows for irrigation of the surrounding landscaped gardens.
Our services
|
|